Blog

Discover our latest articles and blogs

Facility Managers: Condition Based Repaint Plan With Phased Scheduling
September 18, 2026

Facility Managers: Condition Based Repaint Plan With Phased Scheduling

Facility managers: stop guessing. Use condition based inspections and phased scheduling to plan repaints (5–10 years exterior, 2–7 years interior) and cut...

15 Living Room Accent Wall Ideas for 2026: Moody, Textured Looks
September 17, 2026

15 Living Room Accent Wall Ideas for 2026: Moody, Textured Looks

Discover 15 living room accent wall ideas for 2026 that favor moody, textured finishes. Includes LRV guidance, material pros, and prep tips for pro results.

Homeowner's 4 Step Drywall Checklist: Repair or Replace, Finish First
September 16, 2026

Homeowner's 4 Step Drywall Checklist: Repair or Replace, Finish First

A finish-first, 4 step checklist to decide whether to repair or replace drywall. Covers water, mold, texture, and how Tru Painting scopes repairs vs...

8 Front Door Paint Colors for Central Florida: Trend Picks That Last
September 15, 2026

8 Front Door Paint Colors for Central Florida: Trend Picks That Last

Find 8 trend backed front door paint colors for Central Florida homes, plus pro prep and finish tips that resist sun, humidity, and storms.

PVA First for New Drywall, Save a Coat: What Homeowners Should Know
September 14, 2026

PVA First for New Drywall, Save a Coat: What Homeowners Should Know

A homeowner-focused, pro-vetted primer plan: why PVA is the default for clean new drywall, when to choose acrylic or high-build, and application tips.

Homeowners: Use Paintable Exterior Caulk, Skip Lap Joints, Wait a Day
September 13, 2026

Homeowners: Use Paintable Exterior Caulk, Skip Lap Joints, Wait a Day

Contractor-tested steps to caulk exterior trim before painting. Choose paintable caulk, avoid sealing lap joints, and wait a day before you paint.

5 Pro Steps Homeowners Need for Stucco Painting: Spray and Back Roll
September 12, 2026

5 Pro Steps Homeowners Need for Stucco Painting: Spray and Back Roll

Follow five contractor-used steps to paint stucco: clean, repair, pH test and prime, then spray and back roll with two coats. Know when to call a pro.

Clear Paint Smell in 24–48 Hours, Pro Timeline for Homeowners
September 11, 2026

Clear Paint Smell in 24–48 Hours, Pro Timeline for Homeowners

Contractor backed timeline and prioritized fixes to clear paint odor. Learn ventilation, carbon filtration, safety timing, and how oil versus water based...

Weekend Paint Plan: Contractor Recoat Times and 4 Tests for Homeowners
September 10, 2026

Weekend Paint Plan: Contractor Recoat Times and 4 Tests for Homeowners

Plan a realistic weekend repaint with contractor backed recoat times. Use four quick checks: fingernail, tack, hygrometer, patch. Expect 4–6 hours for...